
Rooftop unit set over a street-side building
Needs a road-occupancy permit and a clear radius.
HomeCrane rental
A Mississauga lift starts with the right machine for the radius and the road, not a guess.
Add your site address, the load and the pick height so we can plan the right crane.
Rather talk it through? (226) 400-2111

In short
Crane rental Mississauga means matching the machine to the site before the truck arrives.
The load, the radius, and the path to the set-up decide whether a mobile crane, a boom truck, or a tower crane fits.
Permits and street rules
Submitting a road occupancy application doesn't guarantee a permit, and all applications are processed in the order received. Incomplete road occupancy applications will delay the review process. A temporary roadway occupation road occupancy permit is applied for using the City of Mississauga's Temporary Roadway Occupation form.
Published by the City of Mississauga
Complex construction road occupancy applications must include a certificate of insurance showing aerial crane trespass coverage of $5 million.
Check the source for current amounts.
Site limits
A permit from Credit Valley Conservation is required for site grading and for temporary or permanent placing, dumping or removal of any material, including fill, dirt or stone, within the regulated area. Credit Valley Conservation may require a permit for projects in the Credit River Watershed in the vicinity of a watercourse, floodplain, valley slope, wetland, Lake Ontario or hazardous lands.
Where we lift
Mississauga's road-occupancy permit rules and Credit Valley Conservation limits shape every lift. The crane must fit the street, the wires, and the ground before the boom comes up.
Lift types
A typical Mississauga lift is a rooftop HVAC unit set over a street-side building. The crane is set on the road or the boulevard, the unit is hoisted over the edge, and the signaller guides it onto the curb. Another typical lift is a precast panel or a steel beam placed at the back of a tight site.
The pick point, the landing point, and who is signalling are agreed before the load leaves the ground.

Needs a road-occupancy permit and a clear radius.

May suit an electric self-erecting tower crane.
Which machine
What shapes a quote
Access notes
How a lift is planned
The order of a job here follows the site, the permit, and the ground. Each step is confirmed before the crane moves.
Soft or frozen ground needs mats.
The pick point, the landing point, and who is signalling are agreed.
The crane is packed and the lane is reopened once the lift is complete.
Common mistakes
A Mississauga lift goes wrong when the street, the wires, or the ground are assumed instead of checked.
A temporary road occupation permit is required to use the City's right-of-way to place or operate construction equipment such as mobile cranes. Construction can't begin until the City issues the required permit. Submitting an application doesn't guarantee a permit, and incomplete applications delay the review.
The City of Mississauga provides a form to apply for an alteration of road or city equipment road occupancy permit. The time it takes to get a permit varies depending on the submission, and incomplete applications delay the review. The permit cost is set by the City, not the crane rate.
Call for a free on-site evaluation.
Share the load, the height and the site access, and we will come back with the crane that fits.