HomeCrane rental
Crane Rental Hamilton
A Hamilton lift starts with the right machine for the load, the radius, and the street access.
Request Your Ontario Crane Rental Quote
Add your site address, the load and the pick height so we can plan the right crane.
Rather talk it through? (226) 400-2111

In short
Crane rental Hamilton starts with a site check, not a truck.
The load weight, the radius, and the path to the set-up decide whether a mobile crane, a boom truck, or a tower crane fits.
Permits and street rules
Permits and Street Rules in Hamilton
A lift that touches a public lane or sidewalk in Hamilton needs a Temporary Lane and Sidewalk Occupancy Permit from the City of Hamilton. Applicants must provide a minimum of 5 days notice for that permit.
If the crane or the load blocks a full roadway or one full direction of traffic for more than three to five minutes, a Temporary Road Closure Permit is needed, and a minimum of 2 weeks notice is required to process that application.
A Certificate of Insurance with a minimum 2 million liability naming the City of Hamilton as an additional insured is required prior to a road closure. A Traffic Control Plan must be created, set up and taken down by an OTM Book 7 qualified Traffic Control Company.
Projects along the future Hamilton LRT may require a Corridor Development Permit from Metrolinx prior to applying for temporary sidewalk and lane occupancy.
Published by the City of Hamilton
Unrestricted Lane Occupancy costs $63.55 per 14 days.
Restricted Lane Occupancy costs $63.55 per lane per day.
Check the source for current amounts.
Site limits
Site Limits for a Lift in Hamilton
Site limits in Hamilton come from the ground, the wires, and the clearance. Soft or frozen ground needs mats, because outriggers can sink on a soft patch, a vault, or frost. The street may look open, but a wire or a balcony can cut the radius.
Where we lift
Serving Hamilton and nearby
Hamilton's street rules and site conditions decide the crane, the permit, and the set-up. Oxford Crane checks the site and the street before the crane moves.
Lift types
Lift Types in Hamilton
Typical lifts in Hamilton include rooftop unit sets over street-side buildings, precast panel placement, and steel erection. For a rooftop unit set, the crane is usually placed on the street or a closed lane, the unit is lifted over the building edge, and the signaller guides it onto the curb. For precast or steel work, the crane may need a larger radius and a stronger bearing surface.
Which machine
Picking the right crane for a Hamilton lift
What shapes a quote
What decides the price of a Hamilton lift
- Radius
- Time on site
- Extra moves
- Night or weekend window
- City lane closure permit
How a lift is planned
From Call to Lift in Hamilton
The order of a job in Hamilton follows the site, the permit, and the ground. Each step is confirmed before the crane moves.
Ground and wires
Soft or frozen ground needs mats.
Set-up
The crane is placed on the approved spot, outriggers are set on mats, and the lift plan is double-checked.
Removal
The crane is taken down, the lane is reopened, and the site is cleared.
Common mistakes
Common Mistakes on a Lift in Hamilton
These mistakes go wrong on a Hamilton job because the street, the wires, and the ground are not checked before the crane is booked.
- Setting up under a hydro line because the street looked open The boom can hit the wire, and the lift stops.
- Closing a lane on the day of the lift without the city's road-occupancy permission The city can stop the job, and the crew waits.
- Soft ground without mats The outriggers sink, and the crane cannot lift safely.
- Skipping the site check The pick point and the landing point are not agreed, and the load is not swung over people.
Do I need a permit for a crane in Hamilton?
A lift that touches a public lane or sidewalk needs a Temporary Lane and Sidewalk Occupancy Permit from the City of Hamilton. Applicants must provide a minimum of 5 days notice. If the crane or the load blocks a full roadway or one full direction of traffic for more than three to five minutes, a Temporary Road Closure Permit is needed, and a minimum of 2 weeks notice is required.
What does a crane rental include in Hamilton?
Boom truck rentals include rigging supply: chains, slings, wire ropes, straps and spreaders. One-yard concrete buckets and garbage boxes are supplied at no charge. Rentals are available daily, weekly and monthly, either as a bare rental for your own certified operators or with a certified hoisting engineer.
What is the notice period for a road closure in Hamilton?
A minimum of 2 weeks notice is required to process a Temporary Road Closure Application. A Certificate of Insurance with a minimum 2 million liability naming the City of Hamilton as an additional insured is required prior to a road closure.
Do I need a traffic control plan for a crane in Hamilton?
A Traffic Control Plan must be created, set up and taken down by an OTM Book 7 qualified Traffic Control Company. This applies when a Temporary Road Closure Permit is needed for a full roadway or one full direction of traffic blocked for more than three to five minutes.
Call Oxford Crane for a free on-site evaluation and the right crane for your Hamilton lift
Share the load, the height and the site access, and we will come back with the crane that fits.