Construction crane rental puts a mobile crane and operator on your site for the lifts your project needs. It is the practical choice when a job requires moving steel, precast panels, or rooftop equipment beyond the reach of smaller machines. The right rental matches crane size, reach, and ground conditions to the work, so the lift happens once and happens safely.
What you are after
You need a crane that can safely lift heavy materials on your site without delaying the project.
Before you book
What to Check Before You Book a Construction Crane Rental
A few site details decide which crane fits and whether the rental can proceed on the day you need it. Confirming these points early prevents a crane that cannot set up or a lift that gets rescheduled.
Confirm the lift details
Record the load weight, pickup and placement locations, and any obstacles between them.
Review site access
Check gate widths, overhead wires, and ground conditions along the crane's travel path.
Select the crane class
Choose a mobile crane with enough capacity and boom length for the heaviest lift at the required radius.
Book the rental window
Reserve the crane and operator for the day or days the lifts are scheduled.

The visit
What the Visit Covers
The rental visit focuses on the lift itself. The crane arrives, sets up on outriggers, performs the agreed lifts, and then demobilizes. The scope depends on the crane size and the number of lifts, not on a fixed package of extras.

Pricing
What Changes the Price
Several factors influence the cost of a construction crane rental. Larger cranes with higher capacity and longer booms typically cost more to mobilize and operate. A longer rental period spreads mobilization costs over more days, while a short, single-day lift carries the full setup and teardown expense. Site conditions matter too: a tight access route or soft ground may require a larger crane or additional matting, which changes the price. Finally, the need for specialized rigging or a second operator for complex lifts adds to the total.
What moves the rate
- Crane size and capacity
- Rental duration
- Site access and ground conditions
- Specialized rigging or additional crew
On the day
How the Work Is Done
A construction crane rental follows a straightforward sequence. First, the crane is delivered to the site and positioned on stable ground. The operator extends the outriggers and levels the machine. Then the lift plan is reviewed with the site supervisor, and the crane performs the lifts one at a time. After the final lift, the outriggers are retracted and the crane leaves the site. Throughout the process, the operator manages the crane's movements while ground crew handle rigging and signaling.
Share your lift details
Provide the load weight, reach, height, and site access information.
Receive a crane recommendation
The rental company suggests a crane model and rental window that fits the job.
Confirm the booking
Agree on the date, crane, and any additional services like rigging or matting.
Crane arrives and lifts
The crane is delivered, set up, and performs the lifts under the operator's control.
Planned before the job
Every lift is pre-planned before the job starts.
Not tied up by disruptions
Oxford Crane is a non-union operation, so equipment and operators are not tied up by labour disruptions.
Equipment that is checked
Equipment is inspected daily by the hoisting engineers and annually by independent professional engineers.
A clean safety record
Oxford Crane has a zero lost-time safety record.
A look at your site first
We evaluate the job on site at no charge and pick the most economical, timely and safe machine.
Answered around the clock
We take calls and dispatch day and night, emergency service included.
Booked your way
Rentals are available daily, weekly and monthly, with your own certified operators or with a certified hoisting engineer.
Service areas
Job sites across Ontario.
Construction crane rental serves sites across the region, from tight urban infill projects to open industrial yards. The right crane depends on local ground conditions and access routes.
Questions
Questions People Ask First
Construction crane rental provides a mobile crane and operator for heavy lifts on your site. It is used when a project needs to move steel, precast concrete, or rooftop equipment that smaller machines cannot handle. The rental is matched to the lift weight, reach, and ground conditions so the work is done safely.
How far in advance should I book a construction crane rental?
Booking a week or more ahead gives the best chance of getting the crane size you need on your preferred date. Short-notice rentals are sometimes possible, but the crane selection may be limited. Confirming the lift details early helps the rental company match the right machine to your job.
What information do I need to provide for a crane rental quote?
You will need the heaviest load weight, the distance the crane must reach, and the height it must lift. Also describe the site access, ground conditions, and any overhead obstructions. These details let the rental company recommend a crane that can safely complete the lift.
Does the rental include an operator?
The operator is responsible for the crane's setup, operation, and safe movement during the lift. Ground crew for rigging and signaling is usually arranged by the site, but some rental companies can provide that as well.
What size crane do I need for my project?
The crane size depends on the heaviest load and the farthest reach required. A crane's capacity decreases as the boom extends, so a load that is light at close range may need a larger crane at a long radius. Sharing the lift plan with the rental company is the fastest way to get the right size.
Can a crane rental be done on a single day?
Yes, many lifts are completed in one day. The crane arrives, sets up, performs the lifts, and demobilizes the Complex projects with multiple lifts or difficult access may require the crane to stay on site longer.
What happens if the ground is too soft for the crane?
Soft ground can prevent a crane from setting up safely. In that case, the rental company may recommend crane mats or a larger crane with wider outrigger pads to spread the load. Sometimes the lift must be rescheduled until the ground is stabilized.
Do I need a permit for a crane on the road or sidewalk?
If the crane must set up on a public road or sidewalk, a road occupancy permit is usually required. The rental company can often advise on the permit process, but the site owner is typically responsible for obtaining it. Check with your local municipality early to avoid delays.