Heavy Lift Planning in London

Heavy lift planning in London covers the load, the site, the ground and the season before any machine is set up.

Request Your Ontario Crane Rental Quote

Add your site address, the load and the pick height so we can plan the right crane.

Rather talk it through? (226) 400-2111

mobile crane rental lifting roof trusses at a new residential build site in Ontario at sunset in London, photo 2

In short

Heavy lift planning in London starts with the weight of the load, the access to the site and the ground that will carry the machine. London's rivers, older neighbourhoods and cold winters with frequent thaws each change the plan, so each lift is planned for its own address and season.

Heavy lift planning in London means confirming the load, the site and the ground before a crane is set up. Rooftop units, steel beams, spas and precast pieces all follow the same basic planning order. This page sets out London's neighbourhoods, rivers and seasons and how each one affects a lift.

The problem we solve
A heavy item has to be placed at a London address, and the site, the ground and the season all limit how the lift can be done.
What we cover
Why local ground matters
London's rivers, older neighbourhoods and cold winters with frequent thaws shape how each lift is planned.

The local ground ·

Local Rules in London

Geography sets the first limits on a lift, because it decides where a machine can travel and where it can safely stand. London sits at the confluence of the Thames River and North Thames River. The North and South branches of the Thames River meet at the centre of the city at a location known as The Forks.

Fanshawe Dam was built by the Upper Thames River Conservation Authority in 1953 to control the downstream rivers. Fanshawe Lake was created by Fanshawe Dam to protect downriver areas from catastrophic flooding. Riverbanks and valley slopes matter when a heavy machine needs a firm place to stand.

Ground close to a river can be softer than ground on higher, well-drained land. A crane puts its weight and the weight of the load onto a small area through its outriggers, so the ground under each outrigger has to carry that force.

Mats or cribbing are often placed under outriggers to spread that force across a wider area. A sound lift plan checks the position of buried services, slopes and overhead lines before a machine is set up. Any permit, by-law or road-use requirement for a given site should be confirmed with the city before the lift is booked.

London's river geography, older communities and cold winters with frequent thaws decide where a machine can stand and when the ground can carry it.

  • Wortley Village, part of the former London South suburb annexed in 1890, still retains a distinct sense of place.For your lift Older communities can mean different street widths and access for a lift.
  • London West, formed from the villages of Petersville and Kensington, was annexed to London in 1897.For your lift Older housing can mean smaller yards and tighter access for machine setup.
  • Broughdale, on the city's north end adjoining the university, was annexed to London in 1961.For your lift Each community has its own site layout, so each lift is planned for its address.
  • London has a humid continental climate with modestly warm summers and cold, cloudy winters with frequent snow.For your lift Season affects ground firmness and truck access on lift day.
  • London's winter snowfall averages 194.3 centimetres per year.For your lift Snow and ice can limit how a heavy truck reaches the site.
  • For your liftA thaw can soften the top layer of ground under a machine.
  • For your lift Ground close to a river can be softer, which matters for machine position.
  • For your lift Sites near water call for a closer check of the ground before setup.

How a lift is planned

How the Work Is Planned

A lift is planned backward from the finished position of the load. The first step is to confirm the weight of the item, its dimensions and where it can be safely attached. Rigging gear such as slings, shackles and spreader bars is then chosen to suit that weight and shape.

Next the site is checked for access, overhead obstructions such as power lines, and the ground that will carry the machine. The crane type and configuration are then selected to match the reach and capacity needed. Reading the manufacturer's load chart for that configuration shows the capacity at the planned radius.

A lift plan is prepared and reviewed with the operator and the site contact. On the day, the machine is set up, the lift is carried out, and the equipment is taken away. Anyone not involved in the lift is kept clear of the area while the load is in the air.

Pool and spa placements, rooftop units and steel beams each change the details, but the order of the planning stays the same.

Confirm the load

Weight, dimensions and attachment points are confirmed first.

Check the site

Access, overhead lines and ground are checked next.

Select the crane

The crane and its configuration are matched to the reach and capacity.

Prepare the lift plan

The plan is reviewed with the operator and site contact.

Execute the lift

The machine is set up, the lift is carried out and the equipment is removed.